<p n="2596">Brot. Forward £..29..18S..6D</p>
<p n="2597"> <note type="authorial" place="margin">1789<lb></lb>
May 15th</note>
at Do. Repairing floor in P<obscured></obscured>
and Takeing down two Looms..<lb></lb>
in Ivery Lane and Carrying the same into <rs type="placeName" id="LMSMPS50851_geo753">Bridewell</rs>
<interp inst="LMSMPS50851_geo753" type="placeName" value="Bridewell"></interp>
<interp inst="LMSMPS50851_geo753" type="type" value="undefined"></interp>
..<lb></lb>
10 ft of fit 4x4,6 ft of whole deal,2 ft of 2 Indd.....4..7<lb></lb>
4.3<lb></lb>
½ tt. of Candles16¼ of 20d nails,4 day ¾....18..1½<lb></lb>
Cartage of Looms from Ivey Lane to Bridwell....4..-</p>
<p n="2598"> <note type="authorial" place="margin">Augt. 18th.</note>
Takeing down Caseing to Pump Mens side..<lb></lb>
2 men ¼ Day Each....1..8</p>
<p n="2599"> <note type="authorial" place="margin">the 24th<lb></lb>
to the 26th.}</note>
<lb></lb>
fixing up Wood work to Pump, fixing down new Baseld..<lb></lb>
Do. prepairing and fixing new front & Coves & makeing fitting..<lb></lb>
and hanging door, 3 ft of Oak 8x3,4 ft 6 Do. 6x2,3.8in hold facts..3..7<lb></lb>
6.6 In spikes,2 ft of 2 In deal 15in whide, 2 ft 6 of ¾ deal....2..6<lb></lb>
1x12 ft whole deal, 4 ft run of do.,½ 6 of 10d nls, ¼ 6 of 20d. Do....4..6½<lb></lb>
2 Day ¼....7..6</p>
<p n="2600"> <note type="authorial" place="margin">Septr. 28th<lb></lb>
to<lb></lb>
Octr. 20d.}</note>
<lb></lb>
Prepairing and fixing a safe and shelf in such ward..<lb></lb>
2..12 ft whole deals,1.16 ft Inch do.,2.12 ft ¾ Do.....11..7<lb></lb>
2..yarch of Canvas,3 6 of 2d Clout, ½ 6 of 6d x 4d Brads 16 of 3d Do.....7..2<lb></lb>
½ 6 of 20d nails,2.3 In Bolts,2 Pr. of 2 In Bolts....3..3<lb></lb>
1.3½ Cupbourd Lock,5 day ½.. 1..0..7</p>
<p n="2601"> <note type="authorial" place="margin">Octr. 13th<lb></lb>
and 16th.}</note>
<lb></lb>
Prepairing and fixing in a handle to hemp Beates & makeing<lb></lb>
four forms for sick ward on the mens side..<lb></lb>
3.12 ft whole deals 11 Ins. wd. 2 ft of Cak 1½ sqr. ½ 6 of 10d nls 2 day1¼..17..7</p>
<p n="2602"> <note type="authorial" place="margin">26th.</note>
Repairing floor of one sd. of stairs Landing mens side, fixing..<lb></lb>
skirting and repairing Barracks in Middle ward Ground..<lb></lb>
floor and repairing floor in Lodge..<lb></lb>
2..12 ft whole deals1-12 ft In Do.26 of 20d nails1 Days..13..10<lb></lb>
13.5</p>
<p n="2603"> <note type="authorial" place="margin">Novr. 12th</note>
Repairing door case and hanging door to washhouse in small..<lb></lb>
Yard and Easeing door to Loby next Gate way..<lb></lb>
3 ft of fir 6x3,2.8 In hold fasts,19 of Oak wedges....2..-<lb></lb>
½ 6 of 20d nails½ Day....2..5</p>
<p n="2604"> <note type="authorial" place="margin">17th.</note>
Prepairing and Laying down Covering to Ceopool under<lb></lb>
Gateway of Buildings. Late in Possesion of the Quakes..<lb></lb>
6 ft Sapl. of 2 In Oakplank,½ Day5..15..8</p>
<p n="2605"> <rs type="occupation" id="LMSMPS50851_occ249">Carried</rs>
<interp inst="LMSMPS50851_occ249" type="occupation" value="Carried"></interp>
. Over £36..19..11</p>