[..]
Repairing and new Steeling a pick axe added new Iron cot
2
2 6
Arrew handle to Do.
1
Reparing a Gardener Rake
1
New handle and 3 New revitts to a Shovel
1 6
24
A new knob and reparing the latches of a Doors
1
25
New handle and 3 New revitts to a Spade
1 3
Repairing a spade and one new revitt to Do
6
26
A new pick axe steeled at both ends
7 6
A New handle to Do.
1
31
Oiling the Lacks off the Past and North wings Mans time 1 Day Oil Etc
5
Oiling the water Engre fastning the nutts etc.
1
Oiling the lock the bolts and Winges of the outer Main Gate
1
Augt. 1
Taking off Cleaning repairing and refixing the lock of the Large Gates
5
Mending the bott repairing the Tumbler new screws and fitting 2 Keys etc.
5 6
3
A New fork with 5 Mr Wadle
2
11
15 New Dog nails for the Carpenters
6
12
New revitt and beer and repairing the Knocker of Main Gate
1
13
Taking off Cleaning repairing and refixing a Lock on East wing
5
A New Pass Key to Do.
12
Taking down and refixing the Door
1
Easing and Oiling the locks and Stricking plates 7 cell doors east wing
1 6
Taking off reparring and refixing the outer Door locks
5
A Large new Tenant to the bolt
2 6
Oiling the Hinges bolts and locks of the large ouker Gates 1 Pint Oil
2 6
21
2 New Paper file Irons plats and Staples [mark] 1s each
2
22
Taking off Clearing reparing and refixing 4 cell don locks
on the East Wing51 [..] }
1
4 New Screw'd bolts and nutts to Do. a 1s each
4
6 Wood screws [..] 1d each
6
1 Pint of Oil and [..] time Oiling the 2 Enginers etc.
2 6
New bitt and repairing the Key of a Cell Door lock last wing
1
25
Taking off Cleaning repairing and refixing a Pass dock under Chapell
5
Reparing the Stricting plate taking the door of the Kinges & refindg
1 6
15 12 11
Continued