£ S D
Brought Forward
8 7 5
1795 July 5
Taking off Clearing reparing and refixing a lock on well Door east wing
- 5 -
2 New teeth new handle and reparing a Garden Rake
- 1 6
8
New Stricking plate for a cell door lock in the Yard west wing
- 1 -
Sharping 2 Pick axes at both ends
- 1 -
lengthning 1 Do
- - 6
New handle fitted into a pick axe
- 1 -
1
Large new strong Garden Rake
- 3 6
12
Reparing and Sharping an axe
- 1 -
18
Sharping a pick axe at both ends 6d each Reparg & New Steeling Pick ax 1/6
- 2 -
23
Lengthning a pick axe at both ends 2s new Steeling do both ends 1/6
- 3 6
New pick axe with Steeled ends 7/6 new handle to Do. 1st
- 8 6
Reparing the Head of a Garden Rake 1st and 7 new teeth [mark] Beach 1/9
- 2 9
Repairing the Head of another rake
- 1 -
Lengthning and Sharping a pick axe at both ends
- 1 6
A new pick axe steeled at both ends
- 7 6
Repairing and new Steeling a pick axe added new Iron cot
2
- 2 6
A new handle to Do.
- 1 -
Reparing a Gardener Rake
- 1 -
New handle and 3 New revitts to a Shovel
- 1 6
24
A new Knob and reparing the latches of a Door
- 1 -
25
New handle and 3 New revitts to a spade
- 1 3
Repairing a spade and one new revitt to Do
- - 6
26
A new pick axe steeled at both ends
- 7 6
A New handle to Do.
- 1 -
31
Oiling the Lacks off the East and North wings Mans time 1 Day Oiler
5
Oiling the water Engre fastring the nutts Etc.
- 1 -
Oiling the lock the bott and Winges of the outer Main Gate
- 1 -
Augt. 1
Taking off Clearing repairing and refixing the lock of the Large Gates
- 5 -
Mending the bott repairing the Tumbler new screws and fitting 2 Keys Etc.
- 5 6
3
A New fork with 5P Nodle
- 2 -
11
15 New Dog nails for the Carpenters
- - 6
12
New revitt and beer and repairing the Knocker of Main Gate
- 1 -
13
Taking off Cleaning reparing and refixing a Lock on East wing
- 5 -
A New Pass key to Do.
- 12 -
Taking down and refixing the Door
- 1 -
Easing and Oiling the locks and Stricking plates 7 cell doors east wing
- 1 6
Taking off reparing and refixing the outer Door locks
- 5 -
A Large new Tenant to the bolt
- 2 6
Oiling the Hinges bolts and locks of the large outer Gates 1 Pint Oil
- 2 6