£ s d

Continued210..17..5½

1794

Augt. 19
to the 30}


Letting in Iron [..] round Seals in Chaple fixing bears to Iron Railing round
gallery Cutting away for plumbers to fix the Pipes to water Closett Conter building
& fixing props at Edge do. makeing mould to Iron railing to East & ever front
fixing Prices for Plumber to fix the [..] to water Clerk. & fixing up prices
to Support the Arch to doorway. to Courts next Tank evert front [..]
Grounds for Glass out side of Lodge makeing trough for Smith to Run
the laid into holes of Iron Grateing to rendevowze Center Building

2.12 feet ¾ deal1.12 feet 1¼ do1.16 ft 1½ deal- 9.4
2 feet of do10 feet of do 5 Whide1.12 ft 1½ deal5..1¼

24 ft of fir 2½x2½34 feet of do 4x29 feet of do 6x1½
4 feet of do 4x35 feet of do 6x3¾4 feet 2½ Oak 12 In White}- 14..11¼
1 hund of 4d 15 rads½ hund of 20d nails ¾ C of 10d do. ½ [..] - 1.11½
10 Days & ¾ Carpenter1..17.1½
16.12 feet ¾ deals16.12 feet feather Edge do. 3.12 ft In do3..0..4
2.12 feet 1½ deals32 feet 2 Supr. of do3.12 feet 1½ deal1..5..11¼
76 feet 5 Jno Supr of do40 feet 3d Supr of 2 In do2..7..0½
24 ft Supr of 2¼ do2.12 feet 2½ deals540 feet of 4¼ Ann [..] 5..10.10

41 ft of fir 4x3½86 ft of do 4x434 ft 6 of do 4x4¼
86 feet of do 4x4½34 feet 6 of do 4½x4½17 ft of do 4½x4½, 5 Twin}4..15.2½

Septr 1d
to the 13}


Cutting out Bond, Timber in doorway from Governor One have into
Chaple & fixing in lintle Preparing & fixing stops to Reduces doorway
to lodge unhanging Cutting & unhanging in two parts door to lodge to
front Gates, Cutting away door frame next to Tank evert front and
shortening and hanging door to do.

16 feet of 1½ deal 1½ which10 days & ¼ Carpenter1..17..2½
fastening up the Gate to fence east front
16 feet of 4 In Avus rail ¼ C of 40d nails 10.7 Spikes ¼ Day- 5..5½

Sept. 15
to the 27}

do Attending & Cutting away for plumbers & fixing up peices to Support
lead pipes in Roof, Preparing Temporary desk board takeing down
Seat. & Preparing Wands, fixing up clerk board & makeing good
stage to do fixing up battening to Iron railing fixing up Matting
and Covering seats and fixing chavists do. south East Corner of Chaple
Preparing Stuff to make good floor. where Iron koil was taking up fixg
up temporary ports & sails round well hole. & Preparing hand rail to do.

1-16 feet Inch deal1.12 feet do7 feet of do10 ft of do 4½ 10d.0..7..11½
A feet of 1 In do 3 Jno Whide10 feet of 2½ deal9 feet of Slit deal [..] .. 7.0
14 feet of Clean listing3 feet of ½ In Wamscott4½ whide..2.6¼
31 feet of 2½ mat [..] any 3 Jno whide2 Window Seats2..6.-
16 ft of fir 4x42 feet of do 9x52 feet of do 9x4..6 5
¼ hund of 2d Clout,½ 6 of 3d brads16 of 6d do.3 C of 8 Clout..2..8
12 C of flemish Tacks¾ hund of 10d nails26 & ¼ of 6d do..3..9
1½ C of 20d do¾ hund of 40d do26 Days & ¾ Carpenter4..18..1½
103 feet of fir 12¼x2¼2..5..6

Continued£244..8..6