1783
Brought up£31..17S..2½D
Septr. 6
to
30
repairing the doors to womans wards. in Long Gallery fixing of staples &
hooks Steps to Steps. going from between Gates to governors house fixing of step & fresh
hanging of shutters in all the mens wards 2-10ft inch deals 2-12 ft Listings. 16 20d nail
16 6d Clout 3-14in x Garnett & nail 2 hooks. 2 & Eyes 2 staples 1 day ½ 1 hour}
-..14..1
Octr. 15th to 18th.
prepairing petrs to dry the skem on 13..12 ft 1¼ deals 2 days. ¾2..2..9
Novr. 6
new faceing & planeing the hemp Blocks. grinding the axs. to Chop the Okem with
repairing the stairs in the follows wards. fixing new
[..] Carriage to do. 4 ft 10in for
3x3..7 ft of 2in deal 6½ wd. 3ft of 1½ do. 1½ wd. 2ft 1 of whole deal 11in wd. 3 ft do. 5in wd. 2 ft 7
run of 2 do. 30-¾ screws ¼ C 20d nails 1 Candle 6 days. 1 hr.}
1..6..4½
Do. Pavours Work.
March 28
to
April 1st.
Takeing up the Paving & drying french from wood Tree to water tub for the
Plumber
to putt down Lead pipe Takeing up the Paveing & diging frenches
in order For the Plumbers to Takeup Lead Pipe between the two first
Gates & in First Yard & makeing Good & repareing the same
2 days. 24 Yards. & ½ of paving}
0..18..3
3
makeing good the Paveing round Pump in mens Yard, 5 Yard of Paveing-..2..6
Do. Plumbers Work.
March 8
new Leathering a buckett to womans Pumps new Key to & trying the
sucker 2 men ¼ day}
0..3..6
11
a new sucker to do. & Cleaning & makeing Pump work ¼ day 2 men0..4..6
24
a new buckett to pump mens side & makeing Pump work ¼ day 1 man0..4..9
28
Putting down 1¼ Lead Pipe from wood Tree to water tub & fixing 1½ Comment
acation pipe to water Tub, 15 ft of strong 1¼ Pipe 1 ft of 1½ do. 3-4¼ Joint 2-1¼ do.
1-1¼ ferrall 1-1¼ Cock ball & boss 2-6¼ of 6d Clout 2 Large sheats. of brown
Paper Cutting away & nailing ye Lead on Each water Tub in order to sodder the
Communication pipe ½ day 2 man}
2..17..9
Carried. over£40..11..8