1783

Brought over£..20..15s..1d

June 12th.


to


16


repairing doorway & hanging door to prentices cells repairing floor of mens
hemp shop with new boards & first repairing & Caseing door Leading from
womans passage to mens hemp shops. & repairing the floor in the passage with
new boards first repairing floor of womans gallery next new Prison with
new boards & first 11 ft 6 of oak 4x3..4 ft 10in of do, 6x2½ 5 ft of do. 3x3..11 ft 6in do. 1x4..
11 ft 4in do. 10x2½..13-12 ft whole deals 1-10 ft do 11in wd. 2..12 ft do. 11½in wd, 4 ft of ¾ do. 3in wd.
7 ft of 0½ deal 3in wd. 6 ft run of inch deal 1ft 6in of 1¼in deal 2..12 ft 2 do. 1-10 ft do.
6 wd. 1 pr. of x garnetts . 4th. 16 deg nails 4th, of spikes 66 20d nails ¼ 6 of
30d do. 8 day 8¾}
5..17..2¼

23d.


to


25


Prepairing & fitting & hanging of shutts & prepariring & fixing new hanging st [..]
do. in window of mens house shop prepairing & fixing new sill to door way of do.
3ft 8 of oak 4x3..to 12 ft inch deal 2-10 ft do. 4 ft 9 of whole deal batten 2 pr. of 18in x Garnett
1 Pr. of 11in Strapling 62-10d nails ¼ 6 20d do, 34. 8d Clout ¼ 6 6d nail 1st of spikes 1 day ¾}
..-18..10½

July 1st.


to


5


Preparinging & fixing up shore base & template to garden in large Cellar under of Men's
ward grinding the axed to Cutt the Junk with & fixing up a wench for the men to Empty
Clean & sink the well deeper in mens Yard makeing a seaffold in do. for Plumbers to
Lengthing the pipe prepairing & fixing a new Covering on well & fastening the door
& Cover to womans pumps 5 ft 3 of oak 6x6..4 ft 10in of do. 4½x11..10 ft supr, of 3in oak
plant 5 ft offer 10x4..3-2in oak wedgs. 2ft Long 11 ft of whole deal 5in wd 5 ft do. 6in whide
9 ft run of do. 9in wd. 2.6 spikes 2-5in do, ¼ 6 20s nails Candle 2 days. 2 hours}
2..5..4½

26


&


28th


Prepairing & fixing a stand for water tub between Gates next to womans gate make
ing a Cover to do, & repairing the Covers to the other tubs 4/3 of Oak 12x10..3 ft 6in do. 9x9
6 ft of do. 8x3..5ft of inch deal 4 ft of 2in do. 2in wd. 3ft 10 of oak 6x3½..2 ft 6in do. 5½x2½
1 ft of 16in x Garnett & nails ½ 6 20d nails 1 day ¾ 1 hour}
1..16..11½

Agst. 5th.


to


26th.


Prepairing & fixing new spurr to gateway Leading to governors house & repairing
the post of do. unhanging repairing caseing & hanging door to do. takeing
of the lock & refixing do. & grinding the axes. for to Chop the oakam with
5 ft of oak 3½x2, 1 ft run of inch deal 9in wd. 2..6 spikes 3..20d nails 10-10d do
10-8d Clout 10-3d brade 1 day}
0..4..8¾