<div1 type="SM_PSpage" id="LMSMPS50911PS509110206"> <xptr type="pageFacsimile" doc="LMSMPS509110206"></xptr>
<p n="2911">£ S D</p>
<p n="2912">Brought Forward<lb></lb>
91 3 9½</p>
<p n="2913">1795</p>
<p n="2914">Novr 7<lb></lb>
6 Strong squares for the screens a 9d each<lb></lb>
4 6</p>
<p n="2915">8<lb></lb>
3 New screws and repairing and cleaning the lock of a Blunderbuss<lb></lb>
1 6</p>
<p n="2916">10<lb></lb>
A New bell and carriage in the Porters Lodge<lb></lb>
14<obscured></obscured>
<lb></lb>
5</p>
<p n="2917">Hanging a new pull from the main Gate 1th copper wire 4 Strong Cranks 1 scrott<lb></lb>
Check spring and 1 Elastic Do.}<lb></lb>
14</p>
<p n="2918">Hanging a new pull from the inside of the Main Gate to the Back Gate<lb></lb>
new rod and handle 1 Strong mounted purchase Cranke Check springs Copper wire etc.}<lb></lb>
9</p>
<p n="2919">Hanging a new pull from the Counting House to the Back gate Bell<lb></lb>
6 Strong crankes 2 Check springs the copper wire handle and l<obscured></obscured>
Staples etc}<lb></lb>
16</p>
<p n="2920">6 New cast Iron Bedsteads fitted with screws nutts etc. and Joined compt a<lb></lb>
30s/<lb></lb>
9</p>
<p n="2921">Plate Iron bottoms to Do. squared flatted & punched full<obscured></obscured>
les<lb></lb>
9 3 5<lb></lb>
6d<lb></lb>
25 18 6</p>
<p n="2922">3 New Keys to 3 handcriffs<lb></lb>
3</p>
<p n="2923">Reparing 3 handcriff mending the wormed screws of Do etc a 21d<lb></lb>
5 3</p>
<p n="2924">12<lb></lb>
A New Carriage and fixing to a large bell 2 New additionall Cranks to<lb></lb>
the pulls 1 from the Gate and 1 from the Counting House}<lb></lb>
5</p>
<p n="2925">Taking off cleaning reparing and refixing 2 outer Door locks of the<lb></lb>
Yards leading to the well}<lb></lb>
10</p>
<p n="2926">2 New screws and repairing the Lock of a pistol belonging to the Lumkeys Lodge<lb></lb>
1 6</p>
<p n="2927">14<lb></lb>
Taking off cleaning reparing and refixing 2 Cell door locks Mens side<lb></lb>
10</p>
<p n="2928">2 New Wheel wards to Do. 1/6 and 1 New pipe Key to Do 10/6<lb></lb>
12</p>
<p n="2929">Taking off cleaning repairing and refixing a pass Door lock<lb></lb>
5</p>
<p n="2930">2 New screws to the Box staple 6d A New wheel ward to Do. 9d & 1 Do to plate<lb></lb>
9d<lb></lb>
2</p>
<p n="2931">15<lb></lb>
New Gudgeon and new eye to a Wheelbarrow<lb></lb>
1 6</p>
<p n="2932">Taking off repairing Oiling and refixing outer gate lock<lb></lb>
5</p>
<p n="2933">2<lb></lb>
New hoops to the wheat of a Barrow fixing Do. and repairing the Barrow<lb></lb>
1 6</p>
<p n="2934">17<lb></lb>
4 Wrought Iron bars to a window frame at M Woos Yard1 12<lb></lb>
4½d<lb></lb>
15</p>
<p n="2935">19<lb></lb>
Taking off cleaning reparing and refixing 2 cell door locks Mens side<lb></lb>
10</p>
<p n="2936">Easing a bolt and striking plate<lb></lb>
6</p>
<p n="2937">Taking off cleaning reparing and refixing a cell door lock Womans side<lb></lb>
5</p>
<p n="2938">A New wheel cap and plate to Do<lb></lb>
1 6</p>
<p n="2939">20<lb></lb>
17 bars and 8 pieces circular Toprail 2nd. floor Chapell<lb></lb>
3 2<lb></lb>
8d<lb></lb>
13 1 4</p>
<p n="2940">Mens time 4 Days fixing Do.<lb></lb>
14</p>
<p n="2941">14 Dozen 1½ inch screws to Do.<lb></lb>
5 10</p>
<p n="2942">22<lb></lb>
Taking off cleaning reparing and refixing 3 cell door locks Womans side<lb></lb>
15</p>
<p n="2943">Easing the stricking plates and Oiling Do.<lb></lb>
1</p>
<p n="2944">Taking off Cleaning repairing and refixing a pass Door lock Womans side<lb></lb>
5</p>
<p n="2945">Do.Do.Do.2 cell Door locks on the Mens side<lb></lb>
10</p>
<p n="2946"> <obscured></obscured>
</p>
</div1>

View as Text