<p n="2715"> <obscured></obscured>
</p>
<p n="2716">Repairing and new Steeling a pick axe added new Iron cot<lb></lb>
2<lb></lb>
2 6</p>
<p n="2717">Arrew handle to Do.<lb></lb>
1</p>
<p n="2718">Reparing a Gardener Rake<lb></lb>
1</p>
<p n="2719">New handle and 3 New revitts to a Shovel<lb></lb>
1 6</p>
<p n="2720">24<lb></lb>
A new knob and reparing the latches of a Doors<lb></lb>
1</p>
<p n="2721">25<lb></lb>
New handle and 3 New revitts to a Spade<lb></lb>
1 3</p>
<p n="2722">Repairing a spade and one new revitt to Do<lb></lb>
6</p>
<p n="2723">26<lb></lb>
A new pick axe steeled at both ends<lb></lb>
7 6</p>
<p n="2724">A New handle to Do.<lb></lb>
1</p>
<p n="2725">31<lb></lb>
Oiling the Lacks off the Past and North wings Mans time 1 Day Oil Etc<lb></lb>
5</p>
<p n="2726">Oiling the water Engre fastning the nutts etc.<lb></lb>
1</p>
<p n="2727">Oiling the lock the bolts and Winges of the outer Main Gate<lb></lb>
1</p>
<p n="2728">Augt. 1<lb></lb>
Taking off Cleaning repairing and refixing the lock of the Large Gates<lb></lb>
5</p>
<p n="2729">Mending the bott repairing the Tumbler new screws and fitting 2 Keys etc.<lb></lb>
5 6</p>
<p n="2730">3<lb></lb>
A New fork with 5 Mr Wadle<lb></lb>
2</p>
<p n="2731">11<lb></lb>
15 New Dog nails for the Carpenters<lb></lb>
6</p>
<p n="2732">12<lb></lb>
New revitt and beer and repairing the Knocker of Main Gate<lb></lb>
1</p>
<p n="2733">13<lb></lb>
Taking off Cleaning repairing and refixing a Lock on East wing<lb></lb>
5</p>
<p n="2734">A New Pass Key to Do.<lb></lb>
12</p>
<p n="2735">Taking down and refixing the Door<lb></lb>
1</p>
<p n="2736">Easing and Oiling the locks and Stricking plates 7 cell doors east wing<lb></lb>
1 6</p>
<p n="2737">Taking off reparring and refixing the outer Door locks<lb></lb>
5</p>
<p n="2738">A Large new Tenant to the bolt<lb></lb>
2 6</p>
<p n="2739">Oiling the Hinges bolts and locks of the large ouker Gates 1 Pint Oil<lb></lb>
2 6</p>
<p n="2740">21<lb></lb>
2 New Paper file Irons plats and Staples<figure rend="mark"></figure>
1s each<lb></lb>
2</p>
<p n="2741">22<lb></lb>
Taking off Clearing reparing and refixing 4 cell don locks<lb></lb>
on the East Wing51<obscured></obscured>
}<lb></lb>
1</p>
<p n="2742">4 New Screw'd bolts and nutts to Do. a 1s each<lb></lb>
4</p>
<p n="2743">6 Wood screws<obscured></obscured>
1d each<lb></lb>
6</p>
<p n="2744">1 Pint of Oil and<obscured></obscured>
time Oiling the 2 Enginers etc.<lb></lb>
2 6</p>
<p n="2745">New bitt and repairing the Key of a Cell Door lock last wing<lb></lb>
1</p>
<p n="2746">25<lb></lb>
Taking off Cleaning repairing and refixing a Pass dock under Chapell<lb></lb>
5</p>
<p n="2747">Reparing the Stricting plate taking the door of the Kinges & refindg<lb></lb>
1 6</p>
<p n="2748">15 12 11</p>
<p n="2749">Continued</p>