<div1 type="SM_PSpage" id="LMSMPS50861PS508610067"> <xptr type="pageFacsimile" doc="LMSMPS508610067"></xptr>
<p n="475">..S..D<lb></lb>
Continued £ 41.. 3.. 9¼</p>
<p n="476">1790</p>
<p n="477"> <note type="authorial" place="margin">July 12th<lb></lb>
to the 7th}</note>
<lb></lb>
Prepairing and fixing on a Wood Latch to Temporary door last side taking off &..<lb></lb>
refixing Lock to dr, takeing down Temporary fence to south West Angle of Boundary..<lb></lb>
Wall, caseing Lock and Bolts to Center Gateaway shortening temporary Gate to south<lb></lb>
East Angle of prepairing a mould for masons, requiring Gate & fence reset Road south<lb></lb>
side, fixing<obscured></obscured>
& staples, to dr., repairing ground floor to Clerks House, fixing in <lb></lb>
Pulby to sach frame of Committee Room hanging sash on One Pr. story & fixg. pully..<lb></lb>
to Gate, 1ft 6 of wainst 2 In. sqr.4-10 ft ¾<gap reason="illegible"></gap>
Deals,3ft of dr Batton..5..10</p>
<p n="478">8ft of Inch deal6-12 feet whole deals,4 feet of Iron hoop..18..10</p>
<p n="479">1 screw pulby,1 Iron framed at dr.3 pound of Lead weight,2 1¼ screws..1..4½</p>
<p n="480">1 harsp & staple,¼£ of 4d Clout,½£ of 6d nails,26 ¾ of 10d Dr...3..2</p>
<p n="481">16¼ of 20d nails,¼£ of 40d dr.,¼£ of 20d Bradr.26ft of fis 4x3..7..4</p>
<p n="482">5 days. ¾ Carpents.3 Crown squares in sashes1.. 4..2</p>
<p n="483"> <note type="authorial" place="margin">July 26th</note>
<lb></lb>
Cutting away temporary Boarding to Center Opening of south front & Prepairing and<lb></lb>
Laying down Oak & Plank to foundations of Area Walls of Governers in House<lb></lb>
¼£ of 20d Nails¾ Day 1 hour..3..2½</p>
<p n="484"> <note type="authorial" place="margin">Augst 5th</note>
<lb></lb>
Prepairing moulds for Bricklayer to Work Ramps of Boundary Wall<lb></lb>
8ft Supl. of In deal½ Day..4..</p>
<p n="485"> <note type="authorial" place="margin">Sept 21st<lb></lb>
to the 28th}</note>
<lb></lb>
Repairing fence to Ground outside of Boundary Wall, hanging gate to dr.fixing on lock<lb></lb>
to Door of Inclosure to Well makeing good fence to south west Angle of Boundary Wall,<lb></lb>
and prepairing Wedges & Blockens for stone Masons<lb></lb>
1Ppr. of cross Garrts. & nails wt. 7tt.,-1.9 In stock lock,10ft of fis 4x4,26ft dr. 5½x3½..16..2</p>
<p n="486">4.13ft whole deals1£ of 20 nails2£ of 40d Dr.,5 day ½, 2 Crown sqrs in sashs2..0..2</p>
<p n="487">63 feet Cube of sawing in fit,Cartage of dd. from New House of Correction to the<lb></lb>
Tawpitt,Dr. from the sawpitt to the New House of Correction}<lb></lb>
..12..10</p>
<p n="488"> <note type="authorial" place="margin">Octr 25th<lb></lb>
to the 30th}</note>
<lb></lb>
Prepairing & fixing a stage and Rail over Well in East front, prepairing & fixing an<lb></lb>
Inclosure to pump of dr., fitting & hanging door & fixing on Lock and prepairing<lb></lb>
Blocks & stays. for pipe to Dr, and attending Pumps Makers</p>
<p n="489">46 ft supl. of 3 In Oak plank,7ft supl of 2½ dr.9t of spikes 23ft of strong up her3..4..8</p>
<p n="490">6-12ft 2 In deals,4 ft run of dr.5 ft 16 of dr. Batten,2-14ft Whole deals1..17..2½</p>
<p n="491">4ft 6 of ½ deal,6ft of ¾ dr. 3 Ins whide,¼£ of 40d Nails,¾£ of 10d Dr...3..</p>
<p n="492">2£ ¾ of 20d nails,1-5 In Iron dead Lock,8days. ¼1..14..1½</p>
<p n="493">Altering & Repairing a Horse Center to drains,¼£ of 6d nails½ Day..1..9½</p>
<p n="494"> <note type="authorial" place="margin">Novb the 8th<lb></lb>
to<lb></lb>
Decemr 4th}</note>
<lb></lb>
Stricking Attering and setting Horse sents to drains preparing Battom for,<lb></lb>
taking Dimentions of Well & repairing fence East side of Ground'</p>
<p n="495">46ft 6 of fit 4½x2½,8ft 6 of dr. 6x6,13ft of dr. 6x4<lb></lb>
4ft 6 of dr. 5x4,15ft of dr. 4½x4,2ft of dr. 9x3}<lb></lb>
1..1..8</p>
<p n="496">7-12ft whole deals5ft run of dr.1-12ft Slit deal,4tt of spikes1..3..10</p>
<p n="497">1-14 ft 1½ deal 11 In wd2£¼ of 40d nails¾£ of 10d De5 days ½1..9..11½</p>
<p n="498">36ft Supl. of 4 In fit Plank for Well,Cartage of dr.1..9</p>
<p n="499">£60..6..1¼</p>
</div1>

View as Text