<p n="3444">1783</p>
<p n="3445">Brought up £15..14S:3D</p>
<p n="3446"> <note type="authorial" place="margin">April 14th</note>
<lb></lb>
<note type="authorial" place="margin">to</note>
<lb></lb>
<note type="authorial" place="margin">May 15th:</note>
<lb></lb>
Fixing on new spring sash fastenings: to the windows of the Governors,<lb></lb>
house Fixing new pulleys to sash frames & Caseing sashs. in Do take<lb></lb>
the Locks of sashs. to bow windows in order to have them Repaird. &<lb></lb>
refixing do: prepairing & makeing Cover for Tap water tub & paint<lb></lb>
ing the water tubs Between Gates 1.10 ft inch deal 6 ft of panty to lath<lb></lb>
1.2in wainst. Pulley & wire 7 setts of spring sash fastenings 2 Yards<lb></lb>
of sash Line 50.¾ screws ½ 6 10d nails 10.6d Do. ½ 64d Brads<lb></lb>
2 days ¼ Carpenter, 21 Yards of Paint}<lb></lb>
1..9..4</p>
<p n="3447"> <note type="authorial" place="margin">11th</note>
<lb></lb>
<note type="authorial" place="margin">&</note>
<lb></lb>
<note type="authorial" place="margin">17th</note>
<lb></lb>
Stoping up a door way that Leads. out of the Loby or Counting house<lb></lb>
into the first Yard Cutting a doorway throw the Pertition faceing<lb></lb>
the Lodge door & makeing all the work Good with dover lineings. mould<lb></lb>
ings. skirting & sundrys. prepariring & fixing new step. & Risers. to doorway<lb></lb>
& painting the alteration Prepairing the barracks. in middle ward<lb></lb>
ground floor mens side pr 12 ft whole deal 6 ft run of do. 6 ft of do<obscured></obscured>
<lb></lb>
7 small doy nails 2 inch screws 10-6in spikes ¼ 6 30d nail 26¾ of<lb></lb>
20d nails 16½ of 6d brads 4 days ½ 4 Yards ½ of Prusian Blue}<lb></lb>
1..10..2</p>
<p n="3448"> <note type="authorial" place="margin">20</note>
<lb></lb>
<note type="authorial" place="margin">to</note>
<lb></lb>
<note type="authorial" place="margin">22d</note>
<lb></lb>
makeing & fixing as tend for water tub in first yard takeing out head of water<lb></lb>
tub fresh driveing ye hoops stoping up bung he to fixing in water staf. to<obscured></obscured>
<lb></lb>
water out to Clean the tubs takeing up the paving for the plumbers to alter Lead pipes<lb></lb>
Saying down paving & prepairing a Cover for water tub makeing an Oak win<lb></lb>
dow frame for window where the debtors. Chimney Stood in mens yard fixing in<lb></lb>
the Iron work to do. Carring it up Fixg it, 3ft of oak 6x5..3 ft do. 6x4½ 5 ft 2 do. 6x3<lb></lb>
3 ft 3do. 6x6..3 ft do, 6x8..2 ft 6 do. 9x3..19¼ do. 4x3½..3 ft 2 of deal 4½ wd. 5 ft do.<lb></lb>
1½ wd. 4 ft 9in of 2½ do, 4in wd. ¼ 6 20d nails 3 days ½ 2 hours}<lb></lb>
1..15..1</p>
<p n="3449"> <note type="authorial" place="margin">26th</note>
<lb></lb>
<note type="authorial" place="margin">to</note>
<lb></lb>
<note type="authorial" place="margin">31st.</note>
<lb></lb>
grinding two axes. to cutt the Junk with repairing the <rs type="placeName" id="LMSMPS50777_geo2005">Ceiling</rs>
<interp inst="LMSMPS50777_geo2005" type="placeName" value="Ceiling"></interp>
<interp inst="LMSMPS50777_geo2005" type="type" value="undefined"></interp>
in the second<lb></lb>
ward in long yattery where the prisoners had Cutterway scraping & painting ye water<lb></lb>
tub 2ft boun of 1½ deal 61 ft of spikes ¾ day 8<obscured></obscured>
do. of Painting}<lb></lb>
0..6..3</p>
<p n="3450"> <rs type="occupation" id="LMSMPS50777_occ857">Carried</rs>
<interp inst="LMSMPS50777_occ857" type="occupation" value="Carried"></interp>
. over£20..15..1</p>