Jump to Content
Jump to Main Navigation
Jump to Section Navigation
Sign in
Register
London Lives 1690 to 1800
Crime, Poverty and Social Policy in the Metropolis
Main Navigation
Home
Search
Browse
Lives
Historical Background
The Project
London Lives Book
<
div1
type
=
"CD_MOpage"
id
=
"WCCDMO36100MO361000017"
>
<
xptr
type
=
"pageFacsimile"
doc
=
"WCCDMO361000017"
>
</
xptr
>
<
p
n
=
"133"
>
to be said in the best Screened Gravel And Defray all Incidental Expences of
<
lb
>
</
lb
>
<
rs
type
=
"placeName"
id
=
"WCCDMO36100_geo78"
>
Levelling
</
rs
>
<
interp
inst
=
"WCCDMO36100_geo78"
type
=
"placeName"
value
=
"Levelling"
>
</
interp
>
<
interp
inst
=
"WCCDMO36100_geo78"
type
=
"type"
value
=
"undefined"
>
</
interp
>
Etc in such form as shall be Directed by the Surveyor, Specifying in the
<
lb
>
</
lb
>
proposal when the said Work shall be Compleated The said Committee likewise
<
lb
>
</
lb
>
Intend to Contract for taking up the Old paving in the Carriage ways of
<
rs
type
=
"placeName"
id
=
"WCCDMO36100_geo79"
>
Milford
</
rs
>
<
interp
inst
=
"WCCDMO36100_geo79"
type
=
"placeName"
value
=
"Milford"
>
</
interp
>
<
interp
inst
=
"WCCDMO36100_geo79"
type
=
"type"
value
=
"undefined"
>
</
interp
>
<
lb
>
</
lb
>
Lane and Little
<
rs
type
=
"placeName"
id
=
"WCCDMO36100_geo80"
>
Essex Street
</
rs
>
<
interp
inst
=
"WCCDMO36100_geo80"
type
=
"placeName"
value
=
"Essex Street"
>
</
interp
>
<
interp
inst
=
"WCCDMO36100_geo80"
type
=
"type"
value
=
"undefined"
>
</
interp
>
And for Repaving the said Streets with large Pebbles
<
lb
>
</
lb
>
laid in the best Screened Gravel Agreeable to such form and Level as shall be
<
lb
>
</
lb
>
Directed by the Survey or under the Inspection of the said Committee or their
<
lb
>
</
lb
>
Supervisor The Contractor to find Labour and Gravel and Defray all Incidental
<
lb
>
</
lb
>
Expences of Levelling Etc such of the Old Pebbles from the Several above Streets as
<
lb
>
</
lb
>
Directed to be Sized & relay'd And the Contractor to provide such further Quantity
<
lb
>
</
lb
>
of good Sized Guernsey pebbles as shall be necessary Compleat the said
<
lb
>
</
lb
>
Carriage ways Specifying in his proposals at what price Per yard for each &
<
lb
>
</
lb
>
when the work shall be Compleated The Committee also Intent to Contract
<
lb
>
</
lb
>
for paving the footways of the Several Streets abovementioned with a Moore Stone Kirb not less
<
lb
>
</
lb
>
than twelve Inches broad and Eight Inches thick and purbeck or Yorkshire Ealand
<
lb
>
</
lb
>
Edge Stone not less than two Inches & a half thick (Samel or bad Stones to be
<
lb
>
</
lb
>
rejected the Contractor to take up the Old foot pavg. & Square and relay such part
<
lb
>
</
lb
>
thereof as shall be Directed to Level the Ground Cart and Carry away all
<
lb
>
</
lb
>
Rubbish Etc or bring in Earth if wanted to make good the Level and find all Material
<
lb
>
</
lb
>
and Workmanship according to the form and Dimensions setout by the Commnrs.
<
lb
>
</
lb
>
Surveyor under the Inspection of the Committee or their Supervisor
<
lb
>
</
lb
>
The Committee Likewise Intend to Contract for paving
<
rs
type
=
"placeName"
id
=
"WCCDMO36100_geo81"
>
Clare Court
</
rs
>
<
interp
inst
=
"WCCDMO36100_geo81"
type
=
"placeName"
value
=
"Clare Court"
>
</
interp
>
<
interp
inst
=
"WCCDMO36100_geo81"
type
=
"type"
value
=
"undefined"
>
</
interp
>
with a flat foot
<
lb
>
</
lb
>
paving not less than two Inches and a half thick (bad Stones to be Rejected) The
<
lb
>
</
lb
>
Contractor to take up the present pavement and Square relay such part thereof
<
lb
>
</
lb
>
as shall be Directed, to Level the Ground Cart and Carry away all Rubbish Etc or bring
<
lb
>
</
lb
>
in Earth if wanted to make good the Level and find all Materials and
<
lb
>
</
lb
>
Workmanship.
</
p
>
<
p
n
=
"134"
>
Each proposer to Specify his price Pr. Foot running for the Kirb and P
<
lb
>
</
lb
>
Yard Square for the Rest of the foot pavements
</
p
>
<
p
n
=
"135"
>
The Contractors to give Security for the Due performance of their Contracts
<
lb
>
</
lb
>
with in a time to be Limitted all proposals to be Delivered Sealed up at the time
<
lb
>
</
lb
>
and place abovementioned
</
p
>
<
p
n
=
"136"
>
Proposed and Agreed that Mr Tapper do such Carpenters Work as may
<
lb
>
</
lb
>
be necessary: Mrs. Meredith do such paviours Work as may be Necessary in the
<
lb
>
</
lb
>
Carriage Way and Mr. Buddle such paving as may be necessary in the foot way
</
p
>
</
div1
>
View as Text
Section Navigation
Home
Search
Browse Documents
Lives
Historical Background
About This Project
Copyright & Citation Guide
Contact Us