Middlesex Sessions:
Sessions Papers - Justices' Working Documents
SM | PS

October 1794

About this document type

Currently Held: London Metropolitan Archives

LL ref: LMSMPS509020209

Image 209 of 235


Continued£2367..15..4½

No:

4 Oak Turnslyles£1/12s/0d6..8..-

1 Oak Communion table-2

Pulpit & Reading desk--..10..-

Spit racks & Shelf--..10..-

Elin Hitchen table-2..11..6

3 severed bars & locks fixed to gates3/9-..8..3

Fectrms:

1 Do.to Great Gates--..3..6

4008..9

Cube fir use & waste9d150..6..6¾
Implements for setting out the Building-15..15..0
£2553..18..2¼

Work done out of Contract

Sqr Feet

£ s d

4..20

Centering to Appertures25s/5..5..-

64 Do. to Purys2d-..10..8

15 Doto Ox Eye splayd Window6-..7..6

Feet jans
272..-

Bracketing to Cornice4d4..10..8

37..-

Circular battening to soffites5d-..15..5

Disins 6/6No:2-10ft: house centers 2ft: 6it: openings}
1..4..2

2-5 ft: Do: 3/31/4 ft: Do: 2/8 1-3ft: Do: 7
1-5 ft Do: 3 ft 30 pesuing 4/21:4 ft opening
2-10 ft: Do: 5ft: opening & 19/-}
1..14..4

1 Ceme mould 2 ft: diameter 7-2 Do: 30 in Do/6
4 Do: 38 in: Do: 3/2 1 Do: 78 Do: 6/6 1 Do: 48 Do: 4/1
Segment 14 ft 8 by 8 ft: 4 10/61 Do 7 ft: by 1 ft: 1/2 9}
1..10..2

1 Do18 ft 8 by 3ft. 7 11/1 Do: 9 ft: 3 by 10 in 1/2 1/5
1 Do7 ft. 3 by 1 ft. 31 Do. 7 ft. 10 by 2 ft. 3/6}
1..8..1

6 moulds at back of purys4s/1..4..-

1..2 ft: camber mould-- - 6

1-3ft: Do9d1:2 ft. 6 Cemi Do:2/6
3-2 ft. 8 Do2/83..3 ft. 2 Do3/2
2-3 ft: 6 Do2/41..4 ft. Do2/3
2-4 ft. 5 Do3/1 segment 5 ft. 10 by 1 ft: 1/2}
1..16..3

1 Do. 7 ft: by 7

Feet Ins:
3797..2

Cube fer & labr& 1s.9d 332..5..0½

23..5

Cir: bond lapd Joints& 2s/8d 3..2..5½

4425..2

fir framed& 1s.10d 405..12..9½
Continued £761..7..0½
£2553..18..2½




View as XML