Middlesex Sessions:
Sessions Papers - Justices' Working Documents
SM | PS

February 1791

About this document type

Currently Held: London Metropolitan Archives

LL ref: LMSMPS508610067

Image 67 of 72


..S..D
Continued £ 41.. 3.. 9¼

1790

July 12th
to the 7th}


Prepairing and fixing on a Wood Latch to Temporary door last side taking off &..
refixing Lock to dr, takeing down Temporary fence to south West Angle of Boundary..
Wall, caseing Lock and Bolts to Center Gateaway shortening temporary Gate to south
East Angle of prepairing a mould for masons, requiring Gate & fence reset Road south
side, fixing [..] & staples, to dr., repairing ground floor to Clerks House, fixing in
Pulby to sach frame of Committee Room hanging sash on One Pr. story & fixg. pully..
to Gate, 1ft 6 of wainst 2 In. sqr.4-10 ft ¾ [..] Deals,3ft of dr Batton..5..10

8ft of Inch deal6-12 feet whole deals,4 feet of Iron hoop..18..10

1 screw pulby,1 Iron framed at dr.3 pound of Lead weight,2 1¼ screws..1..4½

1 harsp & staple,¼£ of 4d Clout,½£ of 6d nails,26 ¾ of 10d Dr...3..2

16¼ of 20d nails,¼£ of 40d dr.,¼£ of 20d Bradr.26ft of fis 4x3..7..4

5 days. ¾ Carpents.3 Crown squares in sashes1.. 4..2

July 26th


Cutting away temporary Boarding to Center Opening of south front & Prepairing and
Laying down Oak & Plank to foundations of Area Walls of Governers in House
¼£ of 20d Nails¾ Day 1 hour..3..2½

Augst 5th


Prepairing moulds for Bricklayer to Work Ramps of Boundary Wall
8ft Supl. of In deal½ Day..4..

Sept 21st
to the 28th}


Repairing fence to Ground outside of Boundary Wall, hanging gate to dr.fixing on lock
to Door of Inclosure to Well makeing good fence to south west Angle of Boundary Wall,
and prepairing Wedges & Blockens for stone Masons
1Ppr. of cross Garrts. & nails wt. 7tt.,-1.9 In stock lock,10ft of fis 4x4,26ft dr. 5½x3½..16..2

4.13ft whole deals1£ of 20 nails2£ of 40d Dr.,5 day ½, 2 Crown sqrs in sashs2..0..2

63 feet Cube of sawing in fit,Cartage of dd. from New House of Correction to the
Tawpitt,Dr. from the sawpitt to the New House of Correction}
..12..10

Octr 25th
to the 30th}


Prepairing & fixing a stage and Rail over Well in East front, prepairing & fixing an
Inclosure to pump of dr., fitting & hanging door & fixing on Lock and prepairing
Blocks & stays. for pipe to Dr, and attending Pumps Makers

46 ft supl. of 3 In Oak plank,7ft supl of 2½ dr.9t of spikes 23ft of strong up her3..4..8

6-12ft 2 In deals,4 ft run of dr.5 ft 16 of dr. Batten,2-14ft Whole deals1..17..2½

4ft 6 of ½ deal,6ft of ¾ dr. 3 Ins whide,¼£ of 40d Nails,¾£ of 10d Dr...3..

2£ ¾ of 20d nails,1-5 In Iron dead Lock,8days. ¼1..14..1½

Altering & Repairing a Horse Center to drains,¼£ of 6d nails½ Day..1..9½

Novb the 8th
to
Decemr 4th}


Stricking Attering and setting Horse sents to drains preparing Battom for,
taking Dimentions of Well & repairing fence East side of Ground'

46ft 6 of fit 4½x2½,8ft 6 of dr. 6x6,13ft of dr. 6x4
4ft 6 of dr. 5x4,15ft of dr. 4½x4,2ft of dr. 9x3}
1..1..8

7-12ft whole deals5ft run of dr.1-12ft Slit deal,4tt of spikes1..3..10

1-14 ft 1½ deal 11 In wd2£¼ of 40d nails¾£ of 10d De5 days ½1..9..11½

36ft Supl. of 4 In fit Plank for Well,Cartage of dr.1..9

£60..6..1¼