£..S..D
Brought Forward36..16..0
1788
Septr.
Prepaireing and fixing up Oak Posts and Railing round,,
Ground front of Session House,,
50 Feet 8 Ins Cube of Oak framed.4s,,
10..2..8
15 Feet 10 Ins Cube of do. wrot and framed.4s/6d,,
3..11..3
23 FeetCube of do. wrot & frd. Rail and round top 4s/9d,,
5..9..3
28 FeetCube of do. wrot & diminsd. past. doom heads 1s,,
7..0..0
12 FeetCube of do. wrot & framed. posts, doom head.4s/9d,,
2..17..0
106 FeetCube of do. wrot, framed. and diminisd. post
with doom Heads
6s,,
31..16..0
24 Feet 9 Ins. Supl. of 1½ Oak wrot two sides & mitred
putt together with white lead
1s/6d
1..17..1½
16 FeetRun of sinking to Lumpost for plinths 12 whidd 96d..
-..8..0
16 FeetRun ofdo.for Impost 5 Inwd. 4d
-..5..4
Diging holes for Posts and Sleepers, and filling in and,,
Raming Ground Round do. 39 day ½ Labourer,,
4..5..7
Carting two double Load of dry Rubbish,,
-..7..0
Diging up Old Tree stamps, spurs Etc. and Lovellin and,,
Clearing up super flubs Rubbish 7 days. Labourer,,
-..15-2
Carting away 5 double Load of super oflues Rubbish,,
-..17..6
3 Yards ½ supr. of Peble Paveing2s/6d,,
-..8-9
10 yards suprs. of do.Taken up and relayd.6d,,
0..5-0
5 Night watching Ground while Open,,
0..10..0
Octr. 3d
to the 14th}
Makeing mould. for Lamp Iron fitting on Irons to Post,,
and Prepairing and fixing
[..]
Majestrates seat for Cushions,,
3 ft of ¾ deal3 dozn ½ of 2½ screws2 day½,,
-..13..1¼
Oct 15th
to the 18th}
at Do and Prepairing fitting and Hanging doors to Press,,
Prepairing and fixing stand for Chamber Pott and Clearing,,
away mud form front of session House,,
Carried forward£108..4..8¾