March 24
10
28


next Chapple [..] 12 ft 172 deal 11in wd: 3ft run Do 10 ft Do 1½ sqr. 2-10ft
whole deals 9 ft 6in Do. 4½ wd. 4 ft 6in un Finch deal 1ft Do. 5in wd. ½th of
Pitch 10th of spikes [..] 35.20d nails 46 30d Do. ½ 66d Do. 5 Candles 4 days. them}
1..12.3½

29th


fixing water tub for Governors house fixing Blocks. under Do boreing
helds in Do, for Plumbers to fix the ferrall Cutting away fence to make
Room for Do. Cutting a hole throw the wall of Governors house for the
Lead pipe that Lead from tub to sink in governors house diging trenet
for Plumbers to Lay the Lead pipe that Leads from wood tree
to governors water tub 2 ft 6in of 1½ Oak 11in wd. 6n of Do. 9x10.
2 ft 6in Do. 6x9.. one water tub 1 day ¼ 1 hours}
1..15..8

april 1st.


4th,


Do making & fixing Cover to governors water tub Hanging ye Covers
to water tubs in Yard repairing Cover top of pump mens side prepair
ing & fixing Cases to water pipes Cook [..] men & women side 8ft x 6in of inch
deal 7 ft of whole deal 7ft Do. Battons of 10in of 2in oak 14in wd. ½ 6 to 10d &20d nails
2 Pr. of 18in x Garnett 326d nails 2 days ¼}
0..17..9½

8th.


10


12


Cutting away in order to make room for to Fix a water tub in [..]
mat the tap makeing & fixing a stand Cutting the water tub & fixing
it on the stand takeing down womans pump takeing up the paveg
round do. & dish stone front of Do. takeing up paveing over pump pipe
that leads to the well in the mens Yard helping to take up the pipe
out of the well in order to have it Changed. it being decayd. in severall
places diging out Ground for the new Lead pump pipe from the
well on the mens side to the pump on ye womans side & 3 Course of bricks
for the pipe to Laying fixing a plug to the Bottom of the pipe repair
ing the Covering to well fitting in the Ground over the pipe & well re-
pairing Slap over Cellar in Chapple where the beer is Lett down to
tap Cellar 6 ft of oak 5x6..2 ft Do. 6x4..2 ft 6 of ¾ deal 1 ft of 2ub Do. 4 ft Do. 11in [..]
30ld of spikes 2lld of hold fasts. ¼ C 20d nails 6 days.}
1..10..6

Carried. over. 15.15:4£15..14..3