<div1 type="SM_PSpage" id="LMSMPS50682PS506820152"> <xptr type="pageFacsimile" doc="LMSMPS506820152"></xptr>
<p n="1070"> <note type="authorial" place="margin">1777</note>
<lb></lb>
Brought up.£25..5..5¾</p>
<p n="1071"> <note type="authorial" place="margin">December 27th.</note>
<lb></lb>
Clearing the Rotten woods out of the small Ward on the Ground<lb></lb>
floor on the Mens Side taking off the Skirting acting the rotten<lb></lb>
ends of the Joists out of the Wall Edging the Old Oak Plank to<lb></lb>
Relay the Floor. Etc</p>
<p n="1072"> <rs type="occupation" id="LMSMPS50682_occ173">Carpenters</rs>
<interp inst="LMSMPS50682_occ173" type="occupation" value="Carpenters"></interp>
6 Days..18..-</p>
<p n="1073">Carting two Loads of<gap reason="illegible"></gap>
Rubbish <rs type="placeName" id="LMSMPS50682_geo415">New Prison</rs>
<interp inst="LMSMPS50682_geo415" type="placeName" value="New Prison"></interp>
<interp inst="LMSMPS50682_geo415" type="type" value="undefined"></interp>
to <rs type="placeName" id="LMSMPS50682_geo416">Twin</rs>
<interp inst="LMSMPS50682_geo416" type="placeName" value="Twin"></interp>
<interp inst="LMSMPS50682_geo416" type="type" value="undefined"></interp>
Mill Street<lb></lb>
and two Loads Old plank from ditto Labourer 1 day}<lb></lb>
..10..-</p>
<p n="1074"> <note type="authorial" place="margin">1778<lb></lb>
January 3</note>
<lb></lb>
Done about Preparing Joists and Old Oak Plank for the Floor on<lb></lb>
the Mens side making holes through the Wall for Air</p>
<p n="1075">36 Feet Oak 7 by 4. 12 Feet do. 7 by 2½. 33 Feet do. 13½ by 4¼. 8 Feet<lb></lb>
do. 7 by 5.8 feet 6. do. 7 by 4½. 38 Feet do. 7½ by 4½. 4 ft do. 12. by 4<lb></lb>
Containd. 35. Feet 5 Cube a 3}<lb></lb>
5..6..3</p>
<p n="1076">Six Candles..-..6</p>
<p n="1077"> <rs type="occupation" id="LMSMPS50682_occ174">Carpenters</rs>
<interp inst="LMSMPS50682_occ174" type="occupation" value="Carpenters"></interp>
10 Days1..10..-</p>
<p n="1078"> <rs type="occupation" id="LMSMPS50682_occ175">Labourers</rs>
<interp inst="LMSMPS50682_occ175" type="occupation" value="Labourers"></interp>
. 2 Days ½..5..-</p>
<p n="1079">Preparing new Oak Plank for the Floor Carpenters. 3 days..9..-</p>
<p n="1080"> <rs type="occupation" id="LMSMPS50682_occ176">Bricklayer</rs>
<interp inst="LMSMPS50682_occ176" type="occupation" value="Bricklayer"></interp>
Raising Brickwork under the Joists<lb></lb>
in the small Ward on the Mens Side diging Foundations & clearing<lb></lb>
old Bricks</p>
<p n="1081">990 Stocks1..9..8¼</p>
<p n="1082">31 hods Mortar-..15..6</p>
<p n="1083">3 Candles..-..3</p>
<p n="1084"> <rs type="occupation" id="LMSMPS50682_occ177">Bricklayer</rs>
<interp inst="LMSMPS50682_occ177" type="occupation" value="Bricklayer"></interp>
and <rs type="occupation" id="LMSMPS50682_occ178">Labourer</rs>
<interp inst="LMSMPS50682_occ178" type="occupation" value="Labourer"></interp>
. 3 days each..15..-</p>
<p n="1085"> <note type="authorial" place="margin">10</note>
<lb></lb>
Preparing and Laying down new and Old Floor making holes<lb></lb>
through the Wall for Air Laying down Joists in the small ward on the<lb></lb>
Mens Side17 feet Oak. 6 by 4½, 7 feet 6. do 6½<lb></lb>
by 4. 14 feet 6. do. 6 by 5. 25 feet 6. do 6½ by 5 56ft. do. 7 by 4. 24 feet 6.<lb></lb>
do. 7 by 4½. 33 feet do. 7 ½ by 4 18 feet do. 7½ by 4½. 31 feet do. 7 by 5<lb></lb>
63 feet. do. 8 by 4. 7 feet do. 8 by 4½. 8 feet do. 8½ by 4.7 feet do. 14 by 4</p>
<p n="1086">Containd 68.3 Cube10..4..9<lb></lb>
310 feet 3 Inches Supl new 2 inch Oak Plank 8d. 10..6..10<lb></lb>
89th. Spikes1..17..1<lb></lb>
14 Candles-..1..2<lb></lb>
Carpenters 26 Days ½3..19..6</p>
<p n="1087">Carried Over £63..14..0</p>
</div1>

View as Text