1777
Brought Over£40..7..2¾
Septemr. 20
Labourer
. ½day Carrying. out Rubbish.-..1..-
Labourer
1 day ¼ carrying Rubbish out of Mr Halls yard. yt.
was made for Diging. Cut for the Cellar Stairs-..2..6
27
Carpenter Fartning Knocker on Front Gate. repairing Hicks
and Floor. in the Womens Wards. over Hemp Shop
7. feet Fiz Liby 3-..1..¾
3½ 12ft. whole deals.-..8..2
£2. 20d. nails 3d Saikes-..3..11
Carpenter. 2 days.-..6..-
October 4
Repairing the Floor in the Womens Ward over the Hemp Shop
repairing the Cares to the Water Cocks. on the Mens Side
and Repairing the Apprentices. Cells. Preparing Arris
Oak Coping for the tops. of the Walls. to Six Iron Spikes
on repairing the Gutter over Mr Halls Necessary repairing
the fill of Mr Halls door next the Womens Yard and
repairing a door by the Pallazade Fence and Preparing
a new Oak door Case for the Mens Side
107 Feet run Oak. Arris Coping 1/9½3..-..6½
.4 feet Supl. 1¼ Oak plank-..1..8
1. 14ft. 1¼ dl-..2..9
3. 12ft Slit dl.-..3..9
6. 9 Inch Hold Tarks-..1..3
£2 ½. 20d. ½ £10d. ½ £ 6d. nails and 1 Candle.-..4..-
Carpenters
14 days ¼2..2..9
11
Fixing the Arris Coping on the Walls repairing the Floor of ye
Womens Ward. over the Hemp Shop. repairing the Banacks over
ditto. and making a new Gate. to go into. the Mens. yard
1. 12ft whole deal-..2..4
1. 12ft Inch do.-..1..9
£1½. 20d nails. 1d Spikes.-..2..5
Carpenters
. 10 days ½.1..11..6
18
Fixing up. a Temporary Fence while Gate was hung and
fixing in a new Door Case hanging the new Gate
. taking off
Lock and fixing do. on Temporary door
Carried up£49..4..7